We use cookies to give you the best experience possible. By continuing we’ll assume you’re on board with our cookie policy

Solutions Plus Case Problem Paper

Words: 695, Paragraphs: 7, Pages: 3

Paper type: Essay, Subject: Solutions

Great North American railroad is taking bids for delivery of a cleaning fluid for its locomotives at eleven different locations. Solutions Plus can produce the cleaning fluid for $1. 20 per gallon at their Cincinnati plant. The management team has elected to limit capacity at the Cincinnati plant to 500,000 gallons. Solutions Plus also negotiated with an industrial chemical company in Oakland, California to produce and ship up to 50,000 gallons to the locomotive cleaning fluid at $1. 65 per gallon. Higher cost at the Oakland plant can be offset by lower shipping costs to some of the customers locations.

Total supply of cleaning fluid available to Solutions Plus equates to 550,000 gallons, Great North American railroad demand for the cleaning fluid for the eleven locations is approximately 990,000 gallons. Bid Recommendation The available data avgas analyzed to make a decision on how to distribute the available resources based on the freight and production costs of the cleaning fluid at each plant. Based on the cost information provided, Solutions Plus has determined that not all locations can be serviced.

Thus, considerations for the transportation problem are evaluated in order to find a feasible solution that also minimizes total cost for Solutions Plus. The main issues that constrain the feasible solution are total supply is not equal to total demand, and unacceptable routes. The first issue of total demand at the eleven locomotive locations exceeding total capacity at the two supply locations is addressed by adding a dummy supply location to meet the excess demand of,ASS gallons. This also leads into the route capacity constraint.

Don't use plagiarized sources. Get Your Custom Essay on Solutions Plus Case Problem
Just from $13,9/Page

Get Essay

Oakland capacity is limited to 50,000 gallons and Cincinnati capacity to 500,000 gallons. The shipping cost and/or unavailability of transportation benzene the plants and some locomotive actions will eliminate some of the routes due to cost inefficiency. These routes are the unacceptable routes and will not be considered for distribution from the specified plant. By removing unacceptable routes, Solutions Plus is able to build a linear programming solution to determine which plant}locomotive location combinations are optimal.

Based on the shipping cost provided, the routes that are eliminated are as follows: I) Prom Cincinnati to Santa Ana, Los Angels, Glendale, and Sacramento 2) From Oakland to Houston, Kansas City, Jacksonville, Little Rock, and Bridgeport In order to minimize cost, the 500,000 loans of cleaning fluid from the Cincinnati plant will be distributed as follows: 1) El Paso – 6,583 at a cost of $13,429. 67 2) Pendleton – 80,290 at a cost of SASS,988. 70 3) Houston – 100,447 at a cost of $165,737. 55 4) Kansas City – 105279 at a cost of $165,795. 9 5) Jacksonville – 48,285 at a cost of $74,359. 33 6) Little Rock – 88,335 at a cost of S135036. 33 7) Bridgeport – 69,780 at a cost of $107,460. 86 The 50,000 gallons of cleaning fluid from the Oakland plant will be distributed as follows: 1) II Paso- 190 cost$ASS. 02 2) Sacramento – 49,810 at a cost of $89,657. 30 Total capacity tort both plants will service seven locomotive locations at a minimum cost of $915,920. 77. This final bid for Solutions Plus, which includes a 15% markup, for Great North American, should be $1,053,656. 60.

Decision Factors The bid recommendation above is based upon current information and prior management team decisions. However we strongly recommend that management consider the following points before submitting a bid ;k Capacity: Will great North American seriously entertain a bid that meets only part of their demand? Management previously decided to limit the number of gallons of leaning fluid produced at the Cincinnati Plant. This decision should be reevaluated to determine fife could improve our chances of having an acceptable bid by increasing our capacity.

In addition we should examine the possibility of contracting with another industrial chemical company to produce and ship additional product. As a result Of our analysis there is unmet demand at the following locomotive locations; Santa Ana, El Paso, Kansas City, Los Angels, Glenda, Jacksonville, Little Rock, Bridgeport, and Sacramento. If we contract with another supplier. These locations should be kept in mind. Fuel Cost: Our analysis was based on current shipping costs.

How to cite this page

Choose cite format:

Solutions Plus Case Problem. (2018, Jun 13). Retrieved from http://paperap.com/paper-on-solutions-plus-case-problem/

Is Your Deadline Too Short?
Let Professionals Help You

Get Help

Our customer support team is available Monday-Friday 9am-5pm EST. If you contact us after hours, we'll get back to you in 24 hours or less.

By clicking "Send Message", you agree to our terms of service and privacy policy. We'll occasionally send you account related and promo emails.
No results found for “ image
Try Our service

Hi, I am Colleen from Paperap.

Hi there, would you like to get such a paper? How about receiving a customized one? Click to learn more https://goo.gl/CYf83b